A multifaceted core and shell build-out that included the installation of a new, state-of-the-art Bio-Chemical Research Laboratory with integrated student work stations and adjoining executive office suites. All work on this project took place while school was in session throughout the busy Interdisciplinary Sciences Building. Our Plumbing subcontractor installed triple-waste streams, de-ionized water and the HVAC Subcontractor installed multiple fume hoods.
University of Montana
Studio Forma
2017
│General Contractor