Solstice Confluence
February 3, 2017
Steel Fabrication Custom Work
February 3, 2017
Project Details:

The existing building was a 15,000 sq.ft. concrete warehouse. Sirius added 3 floors to this structure and created almost 40,000sq.ft. of residential space above the ground floor. The ground floor was then divided into 5 commercial suites with improvements for Pure Barre, Spectrum Children's Science Museum and a restaurant. This project required Sirius to facilitate a land swap with the railroad and remove an abandoned spur line.

Client:

Zenith Holdings, LLC

Architect:

DVG Architecture

Date:

2016

Delivery Service:

│General Contractor, Construction Manager (GC/CM)